Milestones Status Report

From IEEE Milestones Wiki


REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS

Last updated: 20 December 2024

This ongoing report shows the status of Milestones and Special Citations in the various stages of the process, updated frequently by IEEE History Center staff. Milestones and Special Citations are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. Please note the titles given here are shortened or working titles, not the full or official titles. While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. 

To see a count of how many IEEE Milestones have been dedicated, click List of Milestones by year dedicated
For a list of dedicated Milestones in chronological order by date of achievement, see Chronological List of Milestones

To see how many Milestones have been dedicated in each Region and Section, see List of Dedicated Milestones by Region

Interested in proposing a milestone? Any IEEE member can submit a milestone proposal. Here is a list of important achievements suitable for proposal, and which we encourage a proposer to consult the Milestones Guidelines and submit. This list is not exclusive; if you know of other achievements you wish to submit, you are welcome to do so.

CONTENTS:
Section A. Proposals Needing Advocates
Section B.1 Proposals Being Written and Awaiting Completion and Submission
Section C.1 Proposals Proposals Submitted, Awaiting Independent Expert Reviews
Section C.2 Proposals Reviews Received, Awaiting Advocate Decision
Section D.1 Proposals Approved by Advocate and Awaiting Milestones Subcommittee Chair Approval
Section D.2 Proposals Approved by Advocate and Awaiting Citation Approval
Section D.3 Proposals Awaiting Name-in-Citation Approval from Milestones Subcommittee
Section D.4 Proposals Awaiting Further Development or evaluation from Milestones Subcommittee
Section D.5 Proposals Awaiting History Committee Action
Section E Proposals Approved by History Committee and Awaiting Board of Directors Action
Section F Milestones Approved by Board of Directors and the Dedication Ceremonies Are Being Planned
Section G Milestones Dedicated


++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

A. PROPOSAL AWAITING APPOINTMENT OF ADVOCATES BY MILESTONES SUBCOMMITTEE CHAIR:



Proposals with a personal name in the citation are indicated by (*)

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Plaque payment commitment received? Full text of references received? 4 Possible Independent Expert Reviewers Suggested?
2023-02 Acoustical Labyrinth ADVOCATE NEEDED Region 1 Rochester Section
2023-15 Bayer Color Filter Array ADVOCATE NEEDED Region 1 Rochester Section
2023-21 URUPAC, 1977 ADVOCATE NEEDED Region 9 Uruguay Section 3 August 2024 yes yes yes yes yes
2024-01 Discovery of Photoelectrets ADVOCATE NEEDED Region 8 Bulgaria Section
2024-08 Digital TV Standards Converter ADVOCATE NEEDED Region 10 Tokyo Section
2024-20 Discovery of Interstellar Carbon Monoxide, 1970 ADVOCATE NEEDED Region 6 IEEE Tucson Section
2024-27 First Application of Digital Computing to Business Processes, 1951 ADVOCATE NEEDED Region 8 IEEE UKRI Section yes
2024-28 Orbital X-Band Real Aperture Side-Looking Radar of Cosmos-1500 ADVOCATE NEEDED Region 8 IEEE Ukraine Section yes

Advocates must be either current IEEE History Committee members, past IEEE History Committee members, or past proposers or expert reviewers of successful milestone proposals. In March 2024, the History Committee voted that past proposers and expert reviewers of successfully-dedicated Milestone proposals are also eligible to serve as milestones advocates, subject both to having completed proposer/advocate training, and receiving Milestones Subcommittee Chair’s approval. To volunteer to serve as an advocate, contact the IEEE History Staff milestone administrator at ieee-history@ieee.org

B. STATUS

B.1 PROPOSALS BEING WRITTEN AND AWAITING COMPLETION AND SUBMISSION BY PROPOSERS

In the case of inactive Proposals, i.e. proposals which are incomplete or have had no new material added to them for a period of a year, the advocate will email the proposer(s) to advise that the proposal will be deleted from the Milestones Status Report unless there is activity within the next month.

Proposals with a personal name in the citation are indicated by (*)

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Plaque payment commitment received? Full text of references received? 4 Possible Independent Expert Reviewers Suggested?
2011-01 Discovery of High Temperature Superconductivity, 1986 (*) JnMz Region 8 IEEE Switzerland Section yes yes yes
2014-08 Hollow dielectric beam waveguide, 1966 (*) AlMr 8 Ukraine Section
2015-07 Space Shuttle Remote Manipulator JhVr 7 Toronto yes yes yes yes
2016-01 Disconnectable Cable Terminating Device, 1905 JaMg 5 Chicago
2017-12 Apollo Unified S-Band Communications Systems DvMc Region 6 Scottsdale Arizona Section
2020-10 Mechanicville Hydroelectric Facility, 1898 (*) PiKe Region 1 Schenectady Section yes
2021-02 Field Programmable Gate Array BBrg Region 6 Santa Clara Valley Section yes yes
2021-07 Intermodal Transportation System, 1991 PiKe Region 2 Washington DC Section/Vehicular Tech. Soc.
2021-17 Spread Spectrum Communication MrHn Region TBD Section TBD
2021-18 Marconi's Yacht Elettra (*) ErTj Region 8 Italy Section
2022-06 Electronic Lavatory Washlet, 1980 MxCh Region 10 Fukuoka Section
2022-13 Longley-Rice Terrain Model MtSl Region 5 IEEE Denver Section yes yes yes yes
2022-14 Special Citation: AT&T History Museum SrPo Region 1 New Jersey Coast Section yes
2022-20 Development of Optical Image Stabilizer ClSa Region 10 Kansai Section yes yes
2022-21 Small Electronic Calculating Machine, 1948-1951 StSe Region 8 Ukraine Section
2022-23 Theory of Superconductivity, 1957 DvMc Region 4 Central Illinois Section yes
2023-04 Instantaneous Reactive Power in Three-Phase Circuits (*) IvPc Region 10 Tokyo Section
2023-12 Digital Radiography DvBr Region 1 Rochester Section
2023-14 Commercial 800 MHz Analog Cellular DvMc Region 10 Tokyo Section
2023-17 DOCSIS, 1997 KiMo Region 5 Denver Section yes yes
2023-23 Image Stabilizer, 1981-1988 ClSa Region 10 Kansai Section yes
2023-26 Discrete Cosine Transform ClSa Region Section ?, Signal Processing Society
2023-27 Edith Clarke achievements ClSa Region 1 Section ? yes
2024-03 Colossus Mark 1, 1944 BBrg Region 8 UKI Section yes yes yes
2024-04 Radio Astronomy DvBr Region 1 New Jersey Coast Section IM/C Chapter
2024-05 Microwave Oven MxCh Region 1 Boston Section
2024-17 Invention of Deep Learning, 1965 ClSa Region 8 Ukraine Section
2024-19 Usuda Deep Space Center, 1984 SrPo Region 10 IEEE Tokyo Section yes
2024-20 Discovery of Interstellar Carbon Monoxide, 1970 ADVOCATE NEEDED Region 6 IEEE Tucson Section
2024-24 Linux-Based Supercomputing BBrg Region 6 IEEE Albuquerque Section yes yes yes yes yes
2024-28 Orbital X-Band Real Aperture Side-Looking Radar of Cosmos-1500 ADVOCATE NEEDED Region 8 IEEE Ukraine Section yes
2024-29 Augmented Reality for Live Sports Broadcast, KiMo Region 6 Santa Clara Valley yes yes yes yes yes
2024-30 First U.S. Long-Distance Commercial Electric Power Transmission, 1889 RbDn Region 6 IEEE Oregon Section yes yes
2024-31 Datapoint 2200 Personal Computer, 1970 SrPo Region 5 Lone Star Section
2024-32 Blue Light Emitting Diode, 1989-1993(*) TmHs Region 10 Nagoya Section
2024-33 Manchester Code, 1948-1949 BBrg Region 8 UKRI Section
2024-34 Boson Invented By Satyendra Nath Bose, 1924-1925(*) ClSa Region 10 Bangladesh Section
2024-35 White Organic LED, 1993(*) TmHs Region 10 Sendai Section
2024-36 Color Plasma Display, 1993(*) TmHs Region ? Section ?



C. UNDER ADVOCATE AND/OR INDEPENDENT EXPERT REVIEW

C.1. PROPOSALS SUBMITTED AND AWAITING INDEPENDENT EXPERT REVIEWS

Advocates shall complete the review of milestone proposals within six months of submission of the proposal, except in cases where an unusual circumstance or major obstacle arises. Within 2 months, advocate works with proposers to select independent expert reviewers and to make sure all materials submitted are complete; within 4 months, advocate receives expert reviews; within 6 months, advocate completes review and recommends History Committee action.

Advocates please notify History Center Staff Milestones Administrator when reviews have been received.

Proposals whose reviews or advocate decision are overdue will show their docket numbers in red.

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 possible Independent Expert Reviewers suggested? Expert Reviewers chosen due date Reviews due Advocate recomm due
2021-08 Commercialization of Rice Cookers, 1923 PiKe Region 10 Tokyo Section 30 July 2021 yes yes yes 30 September 2021 30 November 2021 30 January 2022
2021-15 Okumura Curve and Commercial Cellular Telephone System (*) DvMc Region 10 Tokyo Section 28 September 2021 yes yes yes yes 28 November 2021 28 January 2022 28 March 2022
2022-01 Commercially Successful CRT for Television (*) SeSl Region 1 North Jersey Section 4 November 2022 yes yes yes yes 4 January 2023 4 March 2023 4 May 2023
2022-02 First Live Commercial Trans-Atlantic Radio Broadcast DvBr Region 1 IEEE Maine Section 6 December 2023 yes yes yes yes 6 February 2023 6 April 2023 6 June 2023
2022-07 Semiconductor Quantum-Well Laser Diode, 1977 (*) DvBr Region 4 Central Illinois Section 3 September 2022 yes yes yes yes 3 November 2022 3 January 2023 3 March 2023
2023-07 Unipolar conduction of metal semiconductor junctions IvPc Region 10 Germany Section 1 December 2023 yes yes yes yes 1 February 2024 1 April 2024 1 June 2024
2023-10 p-q Theory of Three-Phase Instantaneous Real and Imaginary Powers, 1983-1986 IvPc Region 10 Tokyo Section 21 June 2023 yes yes yes yes 21 August 2023 21 October 2023 21 October 2023
2023-11 ALCOR Radar GlCo Region 1 Boston Section 12 March 2024 yes yes yes yes yes 12 May 2024 12 July 2024 12 September 2024
2023-13 Sidrapong Hydel Power Station ClSa Region 10 Kolkata Section 11 November 2024 yes yes yes yes yes 11 January 2025 11 March 2025 11 May 2025
2023-16 Engineering Data Analysis System sNOVA, 1989-1997 JnMz Region 10 Taipei Section 27 July 2023 yes yes yes yes 27 September 2023 27 November 2023 27 January 2023
2023-21 URUPAC, 1977 ADVOCATE NEEDED Region 9 Uruguay Section 3 August 2024 yes yes yes yes yes 3 October 2024 3 December 2024 3 February 2024
2024-02 Optical Tweezers DvBr Region 1 New Jersey Coast Section, Photonics Society 20 November 2024 yes yes yes yes yes 20 January 2025 20 March 2025 20 May 2025
2024-07 JUNET, 1984 TmHs Region 10 Tokyo Section 15 April 2024 yes yes yes yes yes 15 June 2024 15 August 2024 15 October 2024
2024-09 Super Resolved Microscopy, 1992(*) DvBr Region 1 North Jersey Section 25 November 2024 yes yes yes yes yes 25 January 2025 25 March 2025 25 May 2025
2024-10 Quantum Dots, 1983(*) DvBr Region 1 North Jersey Section 18 November 2024 yes yes yes yes yes 18 January 2025 18 March 2025 18 May 2025
2024-12 Charge Coupled Device Digital Camera, 1970-1974 DvBr Region 1 North Jersey Section 25 November 2024 yes yes yes yes yes 25 January 2025 25 March 2025 25 May 2025
2024-13 Fractional Quantum Hall Effect, 1982(*) DvBr Region 1 North Jersey Section 25 November 2024 yes yes yes yes yes 25 January 2025 25 March 2025 25 May 2025
2024-14 Molecular Beam Epitaxy, 1973-1978 DvBr Region 1 North Jersey Section 26 November 2024 yes yes yes yes yes 26 January 2025 26 March 2025 26 May 2025
2024-15 Theories on Neural Networks MtSl Region 1 North Jersey Section 26 November 2024 yes yes yes yes yes 26 January 2025 26 March 2025 26 May 2025
2024-18 Northern Cross Radio Telescope DvMc Region 8 Italy Section 25 September 2024 yes yes yes yes yes 25 November 2024 25 January 2025 25 March 2025
2024-23 Deutsches Museum special citation SrPo Region 8 IEEE Germany section 29 August 2024 yes yes yes yes yes 29 October 2024 29 December 2024 1 March 2025



Proposals with a personal name in the citation are indicated by (*)



C.2. PROPOSALS WITH INDEPENDENT EXPERT REVIEWS RECEIVED AND AWAITING ADVOCATE DECISION

Advocates shall complete the review of milestone proposals within six months of submission of the proposal, except in cases where an unusual circumstance or major obstacle arises. Within 2 months, advocate works with proposers to select independent expert reviewers and to make sure all materials submitted are complete; within 4 months, advocate receives expert reviews; within 6 months, advocate completes review and recommends History Committee action.

Proposals whose reviews or advocate decision are overdue will show their docket numbers in red.

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert Reviewers suggested? Independent Expert Reviewers chosen due date Reviews due Advocate recomm due

D. BEING FINALIZED FOR, OR EXPECTING, HISTORY COMMITTEE ACTION

D.1. PROPOSALS APPROVED BY ADVOCATES AND AWAITING APPROVAL BY MILESTONES SUBCOMMITTEE CHAIR

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert Reviewers suggested?


D.2. PROPOSALS APPROVED BY ADVOCATES AND AWAITING FINALIZED CITATIONS APPROVAL FROM PROPOSERS

Once the proposers have agreed to the wording, the proposals will be submitted to the History Committee for action. If there is a name in the citation, the proposal will be submitted to the Milestones Subcommittee for pre-approval.

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert Reviewers suggested?

D.3 PROPOSALS AWAITING NAME-IN-CITATIONS APPROVAL BY MILESTONES SUBCOMMITTEE

Next Milestones Subcommittee meeting/teleconference: TBD. If inclusion of name is approved, the proposals will be submitted to the History Committee for action

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 independent Expert Reviewers Suggested?

D.4 PROPOSALS AWAITING FURTHER DEVELOPMENT OR EVALUATION, EITHER BY MILESTONES SUBCOMMITTEE OR HISTORY COMMITTEE

Proposals in this section are being worked on by the Milestones Subcommittee with an eye to recommending improvements to the proposer(s)

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert Reviewers suggested?
2021-12 Variational Reaction Theory for Finite Element Formulation, 1979-1991 JnMz Region 10 Taipei Section 26 April 2022 yes yes yes yes
2022-16 MARS-1 Railroad Reservation System, 1959 JnMz Region 10 Tokyo Section 28 October 2022 yes yes yes yes
2024-22 BELLMAC 32 Microprocessor BBrg Region 1 North Jersey Section 15 November 2024 yes yes yes yes yes

D.5. PROPOSALS AWAITING HISTORY COMMITTEE ACTION

The proposals are expected to be acted upon at the next History Committee meeting or teleconference

Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert Reviewers suggested?
2022-11 Vertical Cavity Surface-Emitting Laser, 1977 (*) JaMg Region 10 Tokyo Section 16 August 2024 yes yes yes yes yes
2024-26 Vacuum Fluorescent Display, 1967(*) TmHs Region 10 IEEE Nagoya Section 28 October 2024 yes yes yes yes yes

E. UNDER BOARD OF DIRECTORS ACTION


(The schedule for upcoming Board of Directors meetings can be found in the right hand column of  http://www.ieee.org/about/corporate/board/index.html or at Upcoming Series )  

E.1 PROPOSALS APPROVED BY HISTORY COMMITTEE; AWAITING CITATION CONFIRMATION FROM PROPOSER(S)


Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert reviewers suggested? Expected date of BoD action
2021-04 ADSL:Expediting Broadband Internet Access for society, 1993-1997 ClSa Region 8 Benelux Section 16 April 2021 yes yes yes yes yes February 2025
2023-22 Silica-Based Arrayed Waveguide SeSl Region 10 Tokyo Section 1 February 2024 yes yes yes yes yes February 2025
2023-24 Advanced Encryption Standard (AES)(*) SeSl Region 8 Benelux Section 30 December 2023 yes yes yes yes yes February 2025
2024-25 First Karaoke Machine, 1967(*) TmHs Region 10 IEEE Tokyo Section 29 October 2024 yes yes yes yes yes February 2025



E.2 PROPOSALS APPROVED BY HISTORY COMMITTEE BEING ACTED UPON AT UPCOMING BOARD OF DIRECTORS MEETING(S) OR TELECONFERENCE(S)


Docket Number Short Name Advocate initials Region Sponsoring Org Unit COMPLETE Proposal submitted Date Section support letter received? Site owner permission letter received? Payment commitment received? Full text of references received? 4 Independent Expert Reviewers Suggested? Expected date of BoD action

F. FINAL APPROVAL GIVEN

F. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED

Docket Number Short Name Region Sponsoring Org Unit Dedication Date Dedication Ceremony Info
2013-22 Introduction of Apple II Computer EiJh 6 Santa Clara Valley Section postponed from 2 May 2020
2013-28 Introduction of Apple I Computer EiJh 6 Santa Clara Valley Section postponed from 2 May 2020
2014-06 Macintosh Computer, 1984 JhIp & DvMc 6 Santa Clara Valley Section Postponed from 2 May 2020
2017-09 Itaipu Hydroelectric Power Plant, 1984 ErTj Region 9 Paraguay Section 10 March 2025
2019-09 URUCIB Presidential Information System, 1988 SrPo Region 9 Uruguay Section 4 December 2024
2020-01 Experimental Radio Station XWA, 1919 DvBr Region 7 Montreal Section 6 May 2025
2020-04 Intel 4004 Microprocessor DvBr Region 6 Santa Clara Valley section TBD
2020-07 Universal Serial Bus (USB) DvBr Region 6 Oregon Section TBD
2021-01 Commercialization of the Fishfinder, 1948 TmHs Region 10 Kansai Section 21 April 2025
2021-20 Long-Distance Transmission of Three-Phase Alternating Current, 1891 (*) IaPc Region 8 Germany Section and Poland Section 9-12 June 2025
2022-22 Intel 8087 Math Coprocessor BBrg Region 8 Israel Section Postponed from September 2024
2023-01 University of Hawaii 2.2 meter Observatory SrPo Region 6 Hawaii Section
2023-05 Anderson Bridge (*) AtSv Region 8 UKI Section
2023-06 Project Echo DvBr Region 1 New Jersey Coast Section 17 May 2025
2023-09 Cobalt-60 Radiation Cancer Treatment, 1951 DvMc Region 7 London section, North Saskatchewan Section
2023-20 Heavy Ion Accelerator Facility, 1973 BBrg Region 10 Australian Capital Territory Section 26 February 2025
2023-25 Dynamic Single-Mode Semiconductor Laser JnMz Region 10 Tokyo Section
2024-06 Integrated Circuits for Satellite Digital Radio, 1996-1997 KiMo Region 8 France Section, Italy Section
2024-16 First Electrostatic Generator in Japan, 1776(*) TmHs Region 10 Shikoku Section 22 March 2025
2024-21 Fast Fourier Transform (FFT) BBrg Region 1 Section Princeton/Central Jersey and New York Sections 11 June 2025 (IBM NY)

G. DEDICATIONS HELD

 For a list by dedication date of all IEEE Milestones dedicated from the beginning of the Milestone Program, see https://ethw.org/Milestones:List_of_Milestones#Milestones_By_Year_Dedicated_And_Region