'''Last updated: 21 November 2019'''  
+
'''Last updated: 10 August 2020'''  
  
 
This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets.   
 
This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets.   
Line 31: Line 31:
 
|'''Plaque payment commitment received?
 
|'''Plaque payment commitment received?
 
|-
 
|-
|2019-06
+
|2018-12
|[http://ieeemilestones.ethw.org/index.php?title=Milestone-Proposal:Inverter-driven_residential_air_conditioner_1981&action=formedit Inverter-driven air conditioner]
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Milestonei1988ETF  Brain-controlled Robot, 1988]
 
|ADVOCATE NEEDED
 
|ADVOCATE NEEDED
|Region 10
+
|Region 8
|
+
|Macedonia Section
|
+
|17 November 2018
|
 
|
 
|
 
|-
 
|2019-07
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:First_Fiber_Bragg_Grating_Demonstration_at_Communications_Research_Centre_Canada_in_1978 Fiber Bragg Grating, 1978]
 
|ADVOCATE NEEDED
 
|Region 7
 
|Ottawa Section
 
|29 October 2019
 
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|-
 
|-
|2019-08
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Calcutta_Electric_Supply_Corporation_Limited Calcutta Electric Supply Calcultta, 1899]
 
|ADVOCATE NEEDED
 
|Region 10
 
|Kolkata Section
 
|
 
|
 
|
 
|
 
 
|}
 
|}
  
Line 66: Line 47:
 
== B. STATUS  ==
 
== B. STATUS  ==
  
=== B.1 PROPOSALS BEING WRITTEN AND AWAITING SUBMISSION  ===
+
=== B.1 PROPOSALS BEING WRITTEN AND AWAITING COMPLETION AND SUBMISSION  ===
  
 
{| width="600" cellspacing="1" cellpadding="1" border="1"
 
{| width="600" cellspacing="1" cellpadding="1" border="1"
Line 79: Line 60:
 
|'''Site owner permission letter received?
 
|'''Site owner permission letter received?
 
|'''Plaque payment commitment received?
 
|'''Plaque payment commitment received?
 +
|-
 +
|2011-01
 +
|[http://ieeemilestones.ethw.org/index.php?title=Milestone-Proposal:High-Temperature_Superconductivity  High Temperature Superconductivity]
 +
|ABx
 +
|Region 8
 +
|IEEE Switzerland Section
 +
|
 +
|
 +
|yes
 +
|
 
|-
 
|-
 
| 2014-04  
 
| 2014-04  
Line 85: Line 76:
 
| Region 8
 
| Region 8
 
| France Section  
 
| France Section  
|24 July 2019
+
|
 
|
 
|
 
|
 
|
Line 96: Line 87:
 
| Ukraine Section  
 
| Ukraine Section  
 
|  
 
|  
 +
|
 
|
 
|
 
|
 
|
Line 101: Line 93:
 
|2015-07
 
|2015-07
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Space_Shuttle_Remote_Manipulator_System  Space Shuttle Remote Manipulator]
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Space_Shuttle_Remote_Manipulator_System  Space Shuttle Remote Manipulator]
|JSor
+
|JVrd
 
|7
 
|7
 
|Toronto
 
|Toronto
Line 136: Line 128:
 
|yes
 
|yes
 
|yes
 
|yes
|-
 
|2017-04
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Printing_Telegraph Printing Telegraph, 1856-1859]
 
|ElBru
 
|3
 
|IEEE Kentucky Section
 
|
 
|
 
|
 
|
 
|-
 
|2017-05
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Shuttle_Training_Aircraft  Space Shuttle Training and Simulator Software, 1976]
 
|JVar
 
|Region 5
 
|TBD
 
|
 
|
 
|
 
|
 
|-
 
|2017-06
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Early_Broadcast  Stubblefield Broadcast, 1902]
 
|DvBa
 
|Region 3
 
|TBD
 
|
 
|
 
|
 
|
 
 
|-
 
|-
 
|2017-09
 
|2017-09
Line 198: Line 160:
 
|-
 
|-
 
|2018-02
 
|2018-02
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Ocean_exploration_technologies Ocean exploration technologies]
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Alvin:_Deep_Human_Occupied_Research_Submersible,_1964_to_2019 Alvin Deep Human Occupied Research Submersible, 1964]
 
|JVrd
 
|JVrd
 
|Region 1
 
|Region 1
Line 209: Line 171:
 
|2019-08
 
|2019-08
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Calcutta_Electric_Supply_Corporation_Limited Calcutta Electric Supply Calcultta, 1899]
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Calcutta_Electric_Supply_Corporation_Limited Calcutta Electric Supply Calcultta, 1899]
|ADVOCATE NEEDED
+
|RRN
 
|Region 10
 
|Region 10
 
|Kolkata Section
 
|Kolkata Section
 
|
 
|
 
|
 
|
 +
|yes
 +
|
 +
|-
 +
|2019-11
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Computer-controlled_aerial_ladder_systems  Computer-controlled aerial ladders]
 +
|MPol
 +
|Region 10
 +
|Kansai Section
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|2020-06
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Invention_of_the_Laser_Printer  Development of the First Laser Printer]
 +
|DBa
 +
|Region 6
 +
|Santa Clara Valley Section
 
|
 
|
 
|
 
|
 
+
|yes
 +
|
 +
|-
 +
|2020-07
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Universal_Serial_Bus_(USB) Universal Serial Bus (USB)]
 +
|DvBrt
 +
|Region 6
 +
|Oregon Section
 +
|
 +
|yes
 +
|yes
 +
|yes
 
|}
 
|}
  
Line 232: Line 223:
 
|'''Site owner permission letter received?'''
 
|'''Site owner permission letter received?'''
 
|'''Payment commitment received?'''
 
|'''Payment commitment received?'''
|-
 
|2018-09
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:ALOHANET_(aka_ALOHA_System) ALOHANET]
 
|DMi*n
 
|Region 6
 
|Hawaii Section
 
|5 September 2019
 
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2018-12
 
|2018-12
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Milestonei1988ETF  Brain-controlled Robot, 1988]
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Milestonei1988ETF  Brain-controlled Robot, 1988]
|MBns
+
|ADVOCATE NEEDED
 
|Region 8
 
|Region 8
 
|Macedonia Section
 
|Macedonia Section
Line 253: Line 234:
 
|yes
 
|yes
 
|-
 
|-
|2018-13
+
|2019-05
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Fiber_optic_connectors  Fiber Optic Connectors with Push-Pull]
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:INVENTION_OF_SOLID_STATE_DIODE_DETECTOR_SIR_J._C._BOSE_1899-1901 Solid-State Diode Detector, 1899-1901]
|JVr
+
|JnMz
 
|Region 10
 
|Region 10
|Tokyo Section
+
|Kharagpur Section  
|30 November 2018
+
|31 July 2019
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|-
 
|-
|2019-04
+
|2019-09
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Folsom_Powerhouse,_1895 Folsom Powerhouse, 1895]
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:URUCIB URUCIB Presidential Information System, 1988]
 
|ABx
 
|ABx
|Region 6
+
|Region 9
|Sacramento Section
+
|Uruguay Section
|19 Sep 2019
+
|4 March 2020
 +
|Yes
 +
|Yes
 +
|Yes
 +
|-
 +
|2020-01
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Emergence_of_public_radiobroadcasting_with_experimental_station_XWA,_1919 Experimental Radio Station XWA, 1919]
 +
|DBa
 +
|Region 7
 +
|Montreal Section
 +
|5 February 2020
 +
|yes
 +
|yes
 +
|yes
 +
|-
 +
|2020-02
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Birth_of_the_First_CT_Scanner First CT Scanner]
 +
|jvrd
 +
|Region 8
 +
|UKI Section
 +
|
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|-
 
|-
|2019-05
+
|2020-03
|[http://ieeemilestones.ethw.org/Milestone-Proposal:INVENTION_OF_SOLID_STATE_DIODE_DETECTOR_SIR_J._C._BOSE_1899-1901 Solid-State Diode Detector, 1899-1901]
+
|[[Milestone-Proposal:The Grace M. Hopper Milestone|Grace Hopper achievements]]
|JMzk
+
|JHu
|Region 10
+
|Region 2
|Kharagpur Section
+
|Philadelphia Section
|31 July 2019
+
| 27 February 2020
 +
| yes
 +
| Yes
 +
| yes
 +
|-
 +
|2020-04
 +
|[[Milestone-Proposal:Intel 4004 Microprocessor|Intel 4004 Microprocessor]]
 +
|DBa
 +
|Region 6
 +
|Santa Clara Valley section
 +
|18 June 2020
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|yes
 
|-
 
|-
|2019-07
+
|2020-05
|[http://ieeemilestones.ethw.org/Milestone-Proposal:First_Fiber_Bragg_Grating_Demonstration_at_Communications_Research_Centre_Canada_in_1978 Fiber Bragg Grating, 1978]
+
|[[Milestone-Proposal:Commercialization of multi-layer ceramic capacitors with nickel electrode (Ni-MLCCs), 1982.|Commercialization of multi-layer ceramic capacitors with nickel electrode (Ni-MLCCs), 1982]]
|ADVOCATE NEEDED
+
|ETjr
|Region 7
+
|Region 10
|Ottawa Section
+
|Kansai Section
|29 October 2019
+
|8 April 2020
 
|yes
 
|yes
 
|yes
 
|yes
Line 309: Line 320:
 
|'''Payment commitment received?'''
 
|'''Payment commitment received?'''
 
|-
 
|-
|2018-14
+
|2019-12
|[http://ieeemilestones.ethw.org/Milestone-Proposal:%CE%9CPD7720_DSP  μPD7720 Signal Processing Chip]
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:The_Giant_Metrewave_Radio_Telescope_(GMRT)_%E2%80%93_Pune,_India Giant Metrewave Radio Telescope]
|IsSh
+
|JCM
 
|Region 10
 
|Region 10
|Tokyo Section
+
|Pune Section
|18 December 2018
+
|2 July 2020
 
|yes
 
|yes
 
|yes
 
|yes
Line 322: Line 333:
  
 
=== B.4. PROPOSALS AWAITING HISTORY COMMITTEE ACTION  ===
 
=== B.4. PROPOSALS AWAITING HISTORY COMMITTEE ACTION  ===
'''The proposals are expected to be acted upon at the next History Committee meeting or teleconference, which is 16-17 September 2019.'''
+
'''The proposals are expected to be acted upon at the next History Committee meeting or teleconference.'''
  
 
{| width="600" cellspacing="1" cellpadding="1" border="1"
 
{| width="600" cellspacing="1" cellpadding="1" border="1"
Line 353: Line 364:
 
|'''Site owner permission letter received?
 
|'''Site owner permission letter received?
 
|'''Payment commitment received?'''
 
|'''Payment commitment received?'''
 +
|-
 +
|2019-04
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Folsom_Powerhouse,_1895 Folsom Powerhouse, 1895]
 +
|ABx
 +
|Region 6
 +
|Sacramento Section
 +
|19 Sep 2019
 +
|yes
 +
|yes
 +
|yes
 +
|-
 +
|2019-06
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Inverter-driven_residential_air_conditioner_1981 Inverter Air Conditioners, 1980-1981]
 +
|ETej
 +
|Region 10
 +
|Nagoya Section
 +
|6 January 2020
 +
|yes
 +
|yes
 +
|yes
 +
|-
 +
|2019-10
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Bipolar,_CMOS_and_DMOS_super_integrated_technology Multiple Silicon Technologies on a Chip, 1985]
 +
|ETj
 +
|Region 8
 +
|Italy Section
 +
|16 February 2020
 +
|yes
 +
|yes
 +
|yes
 +
|-
 +
|2019-13
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:QR_Code QR Code]
 +
|JVdl
 +
|Region 10
 +
|Nagoya Section
 +
|25 December 2019
 +
|yes
 +
|yes
 +
|yes
 +
|}
 +
 +
 +
=== C. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED  ===
 +
 +
{| width="600" cellspacing="1" cellpadding="1" border="1"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
|
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
| '''Dedication Date'''
 +
|-
 +
|2013-09
 +
|[http://ethw.org/Milestones:Harvard_Mark_1_Computer,_1944_-_1959  Harvard Mark I Computer, 1944-1959]
 +
|
 +
|1
 +
|Boston Section
 +
|TBD
 +
|-
 +
| 2013-22
 +
| [http://ethw.org/Milestones:Introduction_of_the_Apple_II_Computer:_1977-1978  Introduction of Apple II Computer]
 +
| EJ
 +
| 6
 +
| Santa Clara Valley Section
 +
| postponed from 2 May 2020
 +
|-
 +
| 2013-28
 +
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_I_Computer:_1976 Introduction of Apple I Computer]
 +
| EJo
 +
| 6
 +
| Santa Clara Valley Section
 +
| postponed from 2 May 2020
 +
|-
 +
| 2014-06
 +
| [https://ethw.org/Milestones:Apple_Macintosh_Computer Macintosh Computer, 1984]
 +
| JImp & DMi
 +
| 6
 +
| Santa Clara Valley Section
 +
| Postponed from 2 May 2020
 
|-
 
|-
 
|2015-03
 
|2015-03
Line 359: Line 451:
 
|Region 1
 
|Region 1
 
|New Hampshire
 
|New Hampshire
|22 August 2018
+
|TBD
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2017-08
 
|2017-08
Line 369: Line 458:
 
|Region 8
 
|Region 8
 
|Hungary Section
 
|Hungary Section
|10 December 2017
+
|TBD (postponed from 25 March 2020)
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2017-11
 
|2017-11
Line 379: Line 465:
 
|Region 1
 
|Region 1
 
|Connecticut Section
 
|Connecticut Section
|6 February 2019
+
|Virtual Ceremony likely November 2020
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2017-16
 
|2017-16
Line 389: Line 472:
 
|Region 10
 
|Region 10
 
|Tokyo Section
 
|Tokyo Section
|11 January 2018
+
|TBD
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2018-04
 
|2018-04
Line 398: Line 478:
 
|JMaz
 
|JMaz
 
|Region 8
 
|Region 8
|UKRI Section
+
|UKI Section
|3 September 2018
+
|TBD (postponed from 1 May 2020)
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2018-05
 
|2018-05
Line 409: Line 486:
 
|Region 8
 
|Region 8
 
|Italy Section
 
|Italy Section
|21 August 2019
+
|TBD
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2018-06
 
|2018-06
Line 419: Line 493:
 
|Region 8
 
|Region 8
 
|Italy Section
 
|Italy Section
|11 January 2019
+
|TBD (postponed from 12 June 2020, possibly to November of 2020 or early 2021)
|yes
+
|-
|yes
+
|2018-09
|yes
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:ALOHANET_(aka_ALOHA_System) ALOHANET]
 +
|DvMi
 +
|Region 6
 +
|Hawaii Section
 +
|Fall 2020 Virtual installation ceremony; 21 June 2021 full dedication
 
|-
 
|-
 
|2018-10
 
|2018-10
Line 429: Line 507:
 
|Region 6
 
|Region 6
 
|Santa Clara Valley Section
 
|Santa Clara Valley Section
|4 June 2019
+
|TBD
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2018-11
 
|2018-11
Line 439: Line 514:
 
|Region 8
 
|Region 8
 
|Benelux Section
 
|Benelux Section
|17 November 2018
+
|TBD
|yes
+
|-
|yes
+
|2018-13
|yes
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:Fiber_optic_connectors  Fiber Optic Connectors with Push-Pull]
 +
|JVrd
 +
|Region 10
 +
|Tokyo Section
 +
|TBD
 +
|-
 +
|2018-14
 +
|[http://ieeemilestones.ethw.org/Milestone-Proposal:%CE%9CPD7720_DSP  μPD7720 Signal Processing Chip]
 +
|IsSkw
 +
|Region 10
 +
|Tokyo Section
 +
|TBD
 
|-
 
|-
 
|2018-15
 
|2018-15
Line 449: Line 535:
 
|Region 1
 
|Region 1
 
|Long Island Section
 
|Long Island Section
|6 February 2019
+
|TBD
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2019-02
 
|2019-02
Line 459: Line 542:
 
|Region 1
 
|Region 1
 
|North Jersey Section
 
|North Jersey Section
|24 September 2019
+
|TBD (postponed from ?? June 2020)
|yes
 
|yes
 
|yes
 
 
|-
 
|-
 
|2019-03
 
|2019-03
Line 469: Line 549:
 
|Region 5/ Region 6/ Region 8
 
|Region 5/ Region 6/ Region 8
 
|Baton Rouge/Richland/Italy
 
|Baton Rouge/Richland/Italy
|12 August 2019
+
|TBD (postponed from Baton Rouge 1 July 2020/Richland 19 June 2020/Italy 10 June 2020)
|yes (Italy), yes (Richland), yes (Baton Rouge)
 
|yes (Italy), yes (Richland), yes (Hanford), yes (Livingston)
 
|yes (Italy), yes (Richland), yes (Baton Rouge)
 
|}
 
 
 
 
 
=== C. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED  ===
 
 
 
{| width="600" cellspacing="1" cellpadding="1" border="1"
 
 
|-
 
|-
| '''Docket Number'''
+
|2019-07
| '''Short Name'''
+
|[http://ieeemilestones.ethw.org/Milestone-Proposal:First_Fiber_Bragg_Grating_Demonstration_at_Communications_Research_Centre_Canada_in_1978 Fiber Bragg Grating, 1978]
|
+
|DaMic
| '''Region'''
+
|Region 7
| '''Sponsoring Org Unit'''
+
|Ottawa Section
| '''Dedication Date'''
+
|24 August 2020 (at SC2020)
|-
 
|2013-09
 
|[http://ethw.org/Milestones:Harvard_Mark_1_Computer,_1944_-_1959  Harvard Mark I Computer, 1944-1959]
 
|
 
|1
 
|Boston Section
 
|TBD
 
|-
 
| 2013-22
 
| [http://ethw.org/Milestones:Introduction_of_the_Apple_II_Computer:_1977-1978  Introduction of Apple II Computer]
 
| EJ
 
| 6
 
| Santa Clara Valley Section
 
| TBD
 
|-
 
| 2013-28
 
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_I_Computer:_1976 Introduction of Apple I Computer]
 
| EJo
 
| 6
 
| Santa Clara Valley Section
 
| TBD
 
|-
 
| 2014-06
 
| [https://ethw.org/Milestones:Apple_Macintosh_Computer Macintosh Computer, 1984]
 
| JImp & DMi
 
| 6
 
| Santa Clara Valley Section
 
| TBD
 
|-
 
|2017-14
 
|[http://ieeemilestones.ethw.org/Milestone-Proposal:High_Electron_Mobility_Transistor,_HEMT,_1979  High Electron Mobility Transistor, 1979]
 
|JMaz
 
|Region 10
 
|Tokyo Section
 
|18 December 2019
 
 
|}
 
|}
  
Line 533: Line 569:
  
  
                                                         D. OTHER MILESTONES ACTIVITY
+
                          
 
 
[[Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]
 
<br>
 
[[Special:MilestoneProposals|Proposals in progress as well as completed proposals can be viewed here]] NOTE: This is a staff workspace.
 
 
 
 
 
[[Category:IEEE|{{PAGENAME}}]]
 

Latest revision as of 12:28, 10 August 2020


REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS

Last updated: 10 August 2020

This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. Please note the titles given here are shortened or working titles, not the full or official titles. While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. 

To see a count of how many IEEE Milestones have been dedicated, click List of Milestones by year dedicated


For a list of dedicated Milestones in chronological order by date of achievement, see Chronological List of Milestones

To see how many Milestones have been dedicated in each Region and Section, see List of Dedicated Milestones by Region

Interested in proposing a milestone? Any IEEE member can submit a milestone proposal. Here is a list of important achievements suitable for proposal, and which we encourage a proposer to consult the Milestones Guidelines and submit. This list is not exclusive; if you know of other achievements you wish to submit, you are welcome to do so.

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted/Completed Date Section support letter received? Site owner permission letter received? Plaque payment commitment received?
2018-12 Brain-controlled Robot, 1988 ADVOCATE NEEDED Region 8 Macedonia Section 17 November 2018 yes yes yes

Advocates must be either current or past IEEE History Commmittee members. To volunteer to serve as an advocate, contact the IEEE History Staff milestone administrator at ieee-history@ieee.org

B. STATUS

B.1 PROPOSALS BEING WRITTEN AND AWAITING COMPLETION AND SUBMISSION

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date Section support letter received? Site owner permission letter received? Plaque payment commitment received?
2011-01 High Temperature Superconductivity ABx Region 8 IEEE Switzerland Section yes
2014-04 Langevin Sonar, 1917 LyF Region 8 France Section
2014-08 Hollow dielectric beam waveguide, 1966 AMa 8 Ukraine Section
2015-07 Space Shuttle Remote Manipulator JVrd 7 Toronto yes yes yes
2015-14 Alexanderson alternator and multituned antenna, Grimeton JCM 8 Sweden
2016-01 Disconnectable Cable Terminating Device, 1905 JCM 5 Chicago
2017-03 Kodak Digital Camera, 1973-1977 JMaz 1 IEEE Rochester Section yes yes yes
2017-09 Itaipu Hydroelectric Power Plant, 1984 ETej Region 9 Paraguay Section
2017-12 Apollo Unified S-Band Communications Systems DMic Region 6 Scottsdale Arizona Section
2017-13 Global Positioning System, 1973 AMcr Region 6 IEEE Coastal Los Angeles
2018-02 Alvin Deep Human Occupied Research Submersible, 1964 JVrd Region 1 Providence Section
2019-08 Calcutta Electric Supply Calcultta, 1899 RRN Region 10 Kolkata Section yes
2019-11 Computer-controlled aerial ladders MPol Region 10 Kansai Section
2020-06 Development of the First Laser Printer DBa Region 6 Santa Clara Valley Section yes
2020-07 Universal Serial Bus (USB) DvBrt Region 6 Oregon Section yes yes yes

B.2. PROPOSALS SUBMITTED AWAITING ADVOCATE DECISION

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted/Completed Date Section support letter received? Site owner permission letter received? Payment commitment received?
2018-12 Brain-controlled Robot, 1988 ADVOCATE NEEDED Region 8 Macedonia Section 17 November 2018 yes yes yes
2019-05 Solid-State Diode Detector, 1899-1901 JnMz Region 10 Kharagpur Section 31 July 2019 yes yes yes
2019-09 URUCIB Presidential Information System, 1988 ABx Region 9 Uruguay Section 4 March 2020 Yes Yes Yes
2020-01 Experimental Radio Station XWA, 1919 DBa Region 7 Montreal Section 5 February 2020 yes yes yes
2020-02 First CT Scanner jvrd Region 8 UKI Section yes yes yes
2020-03 Grace Hopper achievements JHu Region 2 Philadelphia Section 27 February 2020 yes Yes yes
2020-04 Intel 4004 Microprocessor DBa Region 6 Santa Clara Valley section 18 June 2020 yes yes yes
2020-05 Commercialization of multi-layer ceramic capacitors with nickel electrode (Ni-MLCCs), 1982 ETjr Region 10 Kansai Section 8 April 2020 yes yes yes

B.3. PROPOSALS APPROVED BY ADVOCATES AND AWAITING FINALIZED CITATIONS APPROVAL FROM PROPOSERS

Once the proposers have agreed to the wording, the proposals will be submitted to the History Committee for action

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted/Completed Date Section support letter received? Site owner permission letter received? Payment commitment received?
2019-12 Giant Metrewave Radio Telescope JCM Region 10 Pune Section 2 July 2020 yes yes yes

B.4. PROPOSALS AWAITING HISTORY COMMITTEE ACTION

The proposals are expected to be acted upon at the next History Committee meeting or teleconference.

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted/Completed Date Section support letter received? Site owner permission letter received? Payment commitment received?

B.5.1.. PROPOSALS APPROVED BY HISTORY COMMITTEE BEING ACTED UPON AT UPCOMING BOARD OF DIRECTORS MEETING OR TELECONFERENCE

(The schedule for upcoming Board of Directors meetings can be found in the right hand column of  http://www.ieee.org/about/corporate/board/index.html or at Upcoming Series )  


Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted/Completed Date Section support letter received? Site owner permission letter received? Payment commitment received?
2019-04 Folsom Powerhouse, 1895 ABx Region 6 Sacramento Section 19 Sep 2019 yes yes yes
2019-06 Inverter Air Conditioners, 1980-1981 ETej Region 10 Nagoya Section 6 January 2020 yes yes yes
2019-10 Multiple Silicon Technologies on a Chip, 1985 ETj Region 8 Italy Section 16 February 2020 yes yes yes
2019-13 QR Code JVdl Region 10 Nagoya Section 25 December 2019 yes yes yes


C. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED

Docket Number Short Name Region Sponsoring Org Unit Dedication Date
2013-09 Harvard Mark I Computer, 1944-1959 1 Boston Section TBD
2013-22 Introduction of Apple II Computer EJ 6 Santa Clara Valley Section postponed from 2 May 2020
2013-28 Introduction of Apple I Computer EJo 6 Santa Clara Valley Section postponed from 2 May 2020
2014-06 Macintosh Computer, 1984 JImp & DMi 6 Santa Clara Valley Section Postponed from 2 May 2020
2015-03 BASIC Programming Language, 1964 ETej Region 1 New Hampshire TBD
2017-08 Budapest Metro, 1896 MHa Region 8 Hungary Section TBD (postponed from 25 March 2020)
2017-11 Piezoelectric Quartz Oscillator, 1921-1923 JaH Region 1 Connecticut Section Virtual Ceremony likely November 2020
2017-16 First Operational Large-scale Fingerprint Identification System, 1982 JVrd Region 10 Tokyo Section TBD
2018-04 Active Shielding of Superconducting Magnets JMaz Region 8 UKI Section TBD (postponed from 1 May 2020)
2018-05 International System of Units MPo Region 8 Italy Section TBD
2018-06 Ferraris Early Induction Motor JCMi Region 8 Italy Section TBD (postponed from 12 June 2020, possibly to November of 2020 or early 2021)
2018-09 ALOHANET DvMi Region 6 Hawaii Section Fall 2020 Virtual installation ceremony; 21 June 2021 full dedication
2018-10 Xerox Alto Computer JHui Region 6 Santa Clara Valley Section TBD
2018-11 String Galvanometer for Human Electrocardiogram, 1901-1905 JVrd Region 8 Benelux Section TBD
2018-13 Fiber Optic Connectors with Push-Pull JVrd Region 10 Tokyo Section TBD
2018-14 μPD7720 Signal Processing Chip IsSkw Region 10 Tokyo Section TBD
2018-15 RCA Radio Central DBar Region 1 Long Island Section TBD
2019-02 Neutrodyne Circuit, 1922 DBar Region 1 North Jersey Section TBD (postponed from ?? June 2020)
2019-03 Gravitational Wave Antenna, 1972 DvBa Region 5/ Region 6/ Region 8 Baton Rouge/Richland/Italy TBD (postponed from Baton Rouge 1 July 2020/Richland 19 June 2020/Italy 10 June 2020)
2019-07 Fiber Bragg Grating, 1978 DaMic Region 7 Ottawa Section 24 August 2020 (at SC2020)

D. DEDICATIONS HELD

 For a list by dedication date of all IEEE Milestones dedicated from the beginning of the Milestone Program, see List of Milestones by Dedication Year


For a list of dedicated Milestones in chronological order by date of achievement, see Chronological List of Milestones

For a list of dedicated Milestones by Region, see List of Dedicated Milestones by Region