Milestone-Proposal:Rincon del Bonete Hydroelectric Plant and Transmission System: Difference between revisions

From IEEE Milestones Wiki
No edit summary
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{Proposal|docketid=2011-05|a1=Rincon del Bonete Hydroelectric Plant and Transmission System|a2a=Departament of Tacuarembo, Uruguay|a2b=Uruguay|a3=1937 to 1949|a4=It was the first hydroelectric plant on the “Rio Negro” (Black River) Electrification Schema, located in the middle of the country and that including a long transmission system and two additional plants downriver. Those plants were effectively built later, and the electrical demand of Uruguay was almost completely covered by hydroelectric energy for decades.
{{Proposal
|docketid=2011-05
|a11=Yes
|a3=1937 to 1949
|a1=Rincon del Bonete Hydroelectric Plant and Transmission System
|a2b=Uruguay
|IEEE units paying={{IEEE Organizational Unit Paying
|Unit=Uruguay Section
|Senior officer name=Juan Pechiar
|Senior officer email=juan@pechiar.com
}}
|IEEE units arranging={{IEEE Organizational Unit Arranging
|Unit=Uruguay Section
|Senior officer name=Juan Carlos Miguez
|Senior officer email=j.miguez@ieee.org
}}
|IEEE sections monitoring={{IEEE Section Monitoring
|Section=Uruguay Section
|Section chair name=Juan Pechiar
|Section chair email=juan@pechiar.com
}}
|Milestone proposers={{Milestone proposer
|Proposer name=Juan Carlos Miguez
|Proposer email=j.miguez@ieee.org
}}
|a2a=Departament of Tacuarembo, Uruguay
|a7=The plaque will be installed on an outside wall near the entrance to the Powerhouse, which is still in operation.
 
GPS coordinates are: 56° 25' 18.6" S, 32° 49' 55.5" W
|a8=Yes
|a9=As an important generating facility, the site is well secured.
The plaque will be affixed to an outside wall, where the frequent public/students touristic/educational tours make a stop.
|a10=The site is owned by the public electric utility UTE.
|a4=It was the first hydroelectric plant on the “Rio Negro” (Black River) Electrification Schema, located in the middle of the country and that including a long transmission system and two additional plants downriver. Those plants were effectively built later, and the electrical demand of Uruguay was almost completely covered by hydroelectric energy for decades.
For the country, it meant the availability of abundant, clean, renewable energy and it made up for the lack of fossil fuels in the land. Furthermore, this made possible that the whole population could take advantage of early electrification, development, growth of the production and better quality of life.  
For the country, it meant the availability of abundant, clean, renewable energy and it made up for the lack of fossil fuels in the land. Furthermore, this made possible that the whole population could take advantage of early electrification, development, growth of the production and better quality of life.  
When the first generator went on-line in December 1945 and Energy generated from the river's water started flowing 232 Km to the capital Montevideo, the dream of energy available in the country was finally realized.
When the first generator went on-line in December 1945 and Energy generated from the river's water started flowing 232 Km to the capital Montevideo, the dream of energy available in the country was finally realized.
The completion of the project during the difficult war years set a high mark for the Engineering Profession in Uruguay, who had to re-formulate and adapt the electromechanical equipment,  changing the suppliers from Germany to the United States.|a5=It was the biggest and most ambitious project in the History of the country, and of paramount social and economic significance, given the complete lack of fossil fuels in the country. The big reservoir was at the time (and for many years) the biggest artificial lake in Latin-America, almost 1% of the surface of the whole country!
The completion of the project during the difficult war years set a high mark for the Engineering Profession in Uruguay, who had to re-formulate and adapt the electromechanical equipment,  changing the suppliers from Germany to the United States.
Technologically speaking, the uruguayan engineers that were investigating, working, and buying the necessary parts in the US, had to reformulate the original german project to accommodate US-delivered turbines, generators, transformers, etc. Considerable knowledge of the engineering principles involved and a good dose of ingenuity were necessary, at a time when the war efforts dictated fabrication and transportation priorities, and restricted severely the availability of materials and the delivery of heavy equipment.|a6=Initially, after winning an international bid, construction started by german firm  Siemens in 1937. In 1939, World War II  made delivery of equipment across the Atlantic Ocean almost  impossible. Generalization of the conflict to America  in 1942 -with the civil works almost finished- broke the contract, and qualified manpower was then impossible to obtain from the northern hemisphere. This situation posed insurmountable political and technical obstacles to the finalization of the original project.
|a6=Initially, after winning an international bid, construction started by german firm  Siemens in 1937. In 1939, World War II  made delivery of equipment across the Atlantic Ocean almost  impossible. Generalization of the conflict to America  in 1942 -with the civil works almost finished- broke the contract, and qualified manpower was then impossible to obtain from the northern hemisphere. This situation posed insurmountable political and technical obstacles to the finalization of the original project.
In view of this situation, “RIONE”, the state-owned company in charge of the project, commissioned a motivated group of six young Uruguayan Engineers to study in the US (with Harza, GE,  Westinghouse, Allis Chalmers) so that they could participate proactively in the reformulation of the Project.  
In view of this situation, “RIONE”, the state-owned company in charge of the project, commissioned a motivated group of six young Uruguayan Engineers to study in the US (with Harza, GE,  Westinghouse, Allis Chalmers) so that they could participate proactively in the reformulation of the Project.  
The transformation of the project (50 Hz,  german standards, metric system, ...) required considerable technological alterations in order to make it possible to integrate components made in different plants, following  American Standards in a dam that had been specifically planned and constructed for German turbines and generators.
The transformation of the project (50 Hz,  german standards, metric system, ...) required considerable technological alterations in order to make it possible to integrate components made in different plants, following  American Standards in a dam that had been specifically planned and constructed for German turbines and generators.
Once back in the country, the equipment was installed entirely by local workers trained and directed by those Engineers and the project was finished successfully. This achievement, that also included design and construction the state-of-the-art 150 KV, 232 Km long Transmission System to the capital Montevideo, modifying and adapting as well the original design in order to make it compatible with the equipment procured in the US, set an internationally recognized high mark for the Engineering Profession in Uruguay.|a7=The plaque will be installed on an outside wall near the entrance to the Powerhouse, which is still in operation.|a8=Yes|a9=As an important generating facility, the site is well secured.
Once back in the country, the equipment was installed entirely by local workers trained and directed by those Engineers and the project was finished successfully. This achievement, that also included design and construction the state-of-the-art 150 KV, 232 Km long Transmission System to the capital Montevideo, modifying and adapting as well the original design in order to make it compatible with the equipment procured in the US, set an internationally recognized high mark for the Engineering Profession in Uruguay.
The plaque will be affixed to an outside wall, where the frequent public/students touristic/educational tours make a stop.
|a5=It was the biggest and most ambitious project in the History of the country, and of paramount social and economic significance, given the complete lack of fossil fuels in the country. The big reservoir was at the time (and for many years) the biggest artificial lake in Latin-America, almost 1% of the surface of the whole country!
 
Technologically speaking, the uruguayan engineers that were investigating, working, and buying the necessary parts in the US, had to reformulate the original german project to accommodate US-delivered turbines, generators, transformers, etc. Considerable knowledge of the engineering principles involved and a good dose of ingenuity were necessary, at a time when the war efforts dictated fabrication and transportation priorities, and restricted severely the availability of materials and the delivery of heavy equipment.
GPS coordinates are: 56° 25' 18.6" S, 32° 49' 55.5" W
|submitted=No
|a10=The site is owned by the public electric utility UTE.|a11=Yes|a12=Uruguay Section.  Chair Juan Pechiar,  juan@pechiar.com
|a12=Uruguay Section.  Chair Juan Pechiar,  juan@pechiar.com
Uruguay Section PES-31 Technical Chapter. Chair Ruben Chaer  rchaer@fing.edu.uy|a13name=Juan Pechiar|a13section=Uruguay|a13position=Chair|a13email=juan@pechiar.com|a14name=Juan Pechiar|a14ou=Uruguay Section|a14position=Chair|a14email=juan@pechiar.com|a15Aname=Juan Carlos Miguez|a15Aemail=j.miguez@ieee.org|a15Aname2=Juan Grompone|a15Aemail2=jgrompone@ieee.org|a15Bname=Juan Carlos Miguez|a15Bemail=j.miguez@ieee.org|a15Bname2=Ruben Chaer|a15Bemail2=rchaer@fing.edu.uy|a15Cname=Juan Carlos Miguez|a15Ctitle=Eng|a15Corg=Consultant|a15Caddress=Brasil 867    50000 SALTO    Uruguay|a15Cphone=+598 4733 2848|a15Cemail=j.miguez@ieee.org}}
Uruguay Section PES-31 Technical Chapter. Chair Ruben Chaer  rchaer@fing.edu.uy
|a13name=Juan Pechiar
|a13section=Uruguay
|a13position=Chair
|a13email=juan@pechiar.com
|a14name=Juan Pechiar
|a14ou=Uruguay Section
|a14position=Chair
|a14email=juan@pechiar.com
|a15Aname=Juan Carlos Miguez
|a15Aemail=j.miguez@ieee.org
|a15Aname2=Juan Grompone
|a15Aemail2=jgrompone@ieee.org
|a15Bname=Juan Carlos Miguez
|a15Bemail=j.miguez@ieee.org
|a15Bname2=Ruben Chaer
|a15Bemail2=rchaer@fing.edu.uy
|a15Cname=Juan Carlos Miguez
|a15Ctitle=Eng
|a15Corg=Consultant
|a15Caddress=Brasil 867    50000 SALTO    Uruguay
|a15Cphone=+598 4733 2848
|a15Cemail=j.miguez@ieee.org
}}
[[Media:RDB short History.doc]]

Latest revision as of 18:49, 27 February 2015


To see comments, or add a comment to this discussion, click here.

Docket #:2011-05

This is a draft proposal, that has not yet been submitted. To submit this proposal, click on the edit button in toolbar above, indicated by an icon displaying a pencil on paper. At the bottom of the form, check the box that says "Submit this proposal to the IEEE History Committee for review. Only check this when the proposal is finished" and save the page.


To the proposer’s knowledge, is this achievement subject to litigation?


Is the achievement you are proposing more than 25 years old?


Is the achievement you are proposing within IEEE’s designated fields as defined by IEEE Bylaw I-104.11, namely: Engineering, Computer Sciences and Information Technology, Physical Sciences, Biological and Medical Sciences, Mathematics, Technical Communications, Education, Management, and Law and Policy.


Did the achievement provide a meaningful benefit for humanity?


Was it of at least regional importance?


Has an IEEE Organizational Unit agreed to pay for the milestone plaque(s)?


Has an IEEE Organizational Unit agreed to arrange the dedication ceremony?


Has the IEEE Section in which the milestone is located agreed to take responsibility for the plaque after it is dedicated?


Has the owner of the site agreed to have it designated as an IEEE Milestone? Yes


Year or range of years in which the achievement occurred:

1937 to 1949

Title of the proposed milestone:

Rincon del Bonete Hydroelectric Plant and Transmission System

Plaque citation summarizing the achievement and its significance:


200-250 word abstract describing the significance of the technical achievement being proposed, the person(s) involved, historical context, humanitarian and social impact, as well as any possible controversies the advocate might need to review.


IEEE technical societies and technical councils within whose fields of interest the Milestone proposal resides.


In what IEEE section(s) does it reside?

Uruguay

IEEE Organizational Unit(s) which have agreed to sponsor the Milestone:

IEEE Organizational Unit(s) paying for milestone plaque(s):

Unit: Uruguay Section
Senior Officer Name: Juan Pechiar

IEEE Organizational Unit(s) arranging the dedication ceremony:

Unit: Uruguay Section
Senior Officer Name: Juan Carlos Miguez

IEEE section(s) monitoring the plaque(s):

IEEE Section: Uruguay Section
IEEE Section Chair name: Juan Pechiar

Milestone proposer(s):

Proposer name: Juan Carlos Miguez
Proposer email: Proposer's email masked to public

Please note: your email address and contact information will be masked on the website for privacy reasons. Only IEEE History Center Staff will be able to view the email address.

Street address(es) and GPS coordinates in decimal form of the intended milestone plaque site(s):

Departament of Tacuarembo, Uruguay

Describe briefly the intended site(s) of the milestone plaque(s). The intended site(s) must have a direct connection with the achievement (e.g. where developed, invented, tested, demonstrated, installed, or operated, etc.). A museum where a device or example of the technology is displayed, or the university where the inventor studied, are not, in themselves, sufficient connection for a milestone plaque.

Please give the address(es) of the plaque site(s) (GPS coordinates if you have them). Also please give the details of the mounting, i.e. on the outside of the building, in the ground floor entrance hall, on a plinth on the grounds, etc. If visitors to the plaque site will need to go through security, or make an appointment, please give the contact information visitors will need. The plaque will be installed on an outside wall near the entrance to the Powerhouse, which is still in operation.

GPS coordinates are: 56° 25' 18.6" S, 32° 49' 55.5" W

Are the original buildings extant?

Yes

Details of the plaque mounting:


How is the site protected/secured, and in what ways is it accessible to the public?

As an important generating facility, the site is well secured. The plaque will be affixed to an outside wall, where the frequent public/students touristic/educational tours make a stop.

Who is the present owner of the site(s)?

The site is owned by the public electric utility UTE.

What is the historical significance of the work (its technological, scientific, or social importance)? If personal names are included in citation, include justification here. (see section 6 of Milestone Guidelines)

It was the first hydroelectric plant on the “Rio Negro” (Black River) Electrification Schema, located in the middle of the country and that including a long transmission system and two additional plants downriver. Those plants were effectively built later, and the electrical demand of Uruguay was almost completely covered by hydroelectric energy for decades. For the country, it meant the availability of abundant, clean, renewable energy and it made up for the lack of fossil fuels in the land. Furthermore, this made possible that the whole population could take advantage of early electrification, development, growth of the production and better quality of life. When the first generator went on-line in December 1945 and Energy generated from the river's water started flowing 232 Km to the capital Montevideo, the dream of energy available in the country was finally realized. The completion of the project during the difficult war years set a high mark for the Engineering Profession in Uruguay, who had to re-formulate and adapt the electromechanical equipment, changing the suppliers from Germany to the United States.

What obstacles (technical, political, geographic) needed to be overcome?

Initially, after winning an international bid, construction started by german firm Siemens in 1937. In 1939, World War II made delivery of equipment across the Atlantic Ocean almost impossible. Generalization of the conflict to America in 1942 -with the civil works almost finished- broke the contract, and qualified manpower was then impossible to obtain from the northern hemisphere. This situation posed insurmountable political and technical obstacles to the finalization of the original project. In view of this situation, “RIONE”, the state-owned company in charge of the project, commissioned a motivated group of six young Uruguayan Engineers to study in the US (with Harza, GE, Westinghouse, Allis Chalmers) so that they could participate proactively in the reformulation of the Project. The transformation of the project (50 Hz, german standards, metric system, ...) required considerable technological alterations in order to make it possible to integrate components made in different plants, following American Standards in a dam that had been specifically planned and constructed for German turbines and generators. Once back in the country, the equipment was installed entirely by local workers trained and directed by those Engineers and the project was finished successfully. This achievement, that also included design and construction the state-of-the-art 150 KV, 232 Km long Transmission System to the capital Montevideo, modifying and adapting as well the original design in order to make it compatible with the equipment procured in the US, set an internationally recognized high mark for the Engineering Profession in Uruguay.

What features set this work apart from similar achievements?

It was the biggest and most ambitious project in the History of the country, and of paramount social and economic significance, given the complete lack of fossil fuels in the country. The big reservoir was at the time (and for many years) the biggest artificial lake in Latin-America, almost 1% of the surface of the whole country! Technologically speaking, the uruguayan engineers that were investigating, working, and buying the necessary parts in the US, had to reformulate the original german project to accommodate US-delivered turbines, generators, transformers, etc. Considerable knowledge of the engineering principles involved and a good dose of ingenuity were necessary, at a time when the war efforts dictated fabrication and transportation priorities, and restricted severely the availability of materials and the delivery of heavy equipment.

Supporting texts and citations to establish the dates, location, and importance of the achievement: Minimum of five (5), but as many as needed to support the milestone, such as patents, contemporary newspaper articles, journal articles, or chapters in scholarly books. 'Scholarly' is defined as peer-reviewed, with references, and published. You must supply the texts or excerpts themselves, not just the references. At least one of the references must be from a scholarly book or journal article. All supporting materials must be in English, or accompanied by an English translation.


Supporting materials (supported formats: GIF, JPEG, PNG, PDF, DOC): All supporting materials must be in English, or if not in English, accompanied by an English translation. You must supply the texts or excerpts themselves, not just the references. For documents that are copyright-encumbered, or which you do not have rights to post, email the documents themselves to ieee-history@ieee.org. Please see the Milestone Program Guidelines for more information.


Please email a jpeg or PDF a letter in English, or with English translation, from the site owner(s) giving permission to place IEEE milestone plaque on the property, and a letter (or forwarded email) from the appropriate Section Chair supporting the Milestone application to ieee-history@ieee.org with the subject line "Attention: Milestone Administrator." Note that there are multiple texts of the letter depending on whether an IEEE organizational unit other than the section will be paying for the plaque(s).

Please recommend reviewers by emailing their names and email addresses to ieee-history@ieee.org. Please include the docket number and brief title of your proposal in the subject line of all emails.


Media:RDB short History.doc